Boulder Residence 2

Boulder, CO

  • Project #: 6-2025 | Residential

  • Assignment: Redirect material from the landfill for compliance with Boulder County Building Department requirements

  • Description: Remodel and addition

  • Duration: 6 months

  • Project Contact: Bob Tobiason

    • 408-605-7179

    • bobt@circbuild.com

  • Comments: N/A


Project Metrics:

Materials categories diverted:

  • Metals

  • Mechanical

  • Millwork interior

  • Lumber

  • Furnishings

  • Soil

  • Landscaping - bushes/shrubs

  • Doors

  • Windows

  • Concrete

Analytics:

Volume of materials diverted: 51.47 cubic yards

Reduced area in landfill (phases one and two): 10’ wide x 10’ long x 13.9’ high

Embodied carbon averted through reuse: tbd

Jobs created: 21 labor hours

Previous
Previous

Fort Collins, CO | Commercial Building

Next
Next

Denver, CO | Insulation Overstock