Fort Collins Project
Fort Collins, CO
Project #: 4-2025 | Commercial
Assignment: Maximize the redirection of material away from the landfill and minimize the incremental cost of deconstruction relative to “standard demolition”
Description: Complete demolition of one church and one office building
Duration: 8 months
Project Contact: Bob Tobiason
408-605-7179
bobt@circbuild.com
Comments: N/A
Project Metrics:
Materials categories diverted:
Metals
Millwork exterior
Millwork interior
Electrical
Furnishings
Specialties
Doors
Windows
Concrete
Analytics:
Volume of materials diverted from the landfill (phases one and two): 59.7 cubic yards
Reduced area in landfill (phases one and two): 18’ wide x 18’ long x 5’ high
Volume of materials diverted from the landfill (phase three): 158.15 cubic yards
Reduced area in landfill (phase three): 20’ wide x 20’ long x 11’ high
Embodied carbon averted through reuse/recycling: tbd
Energy saved: tbd
Jobs created: 556 labor hours