Fort Collins Project

Fort Collins, CO

  • Project #: 4-2025 | Commercial

  • Assignment: Maximize the redirection of material away from the landfill and minimize the incremental cost of deconstruction relative to “standard demolition”

  • Description: Complete demolition of one church and one office building

  • Duration: 8 months

  • Project Contact: Bob Tobiason

    • 408-605-7179

    • bobt@circbuild.com

  • Comments: N/A


Project Metrics:

Materials categories diverted:

  • Metals

  • Millwork exterior

  • Millwork interior

  • Electrical

  • Furnishings

  • Specialties

  • Doors

  • Windows

  • Concrete

Analytics:

Volume of materials diverted from the landfill (phases one and two): 59.7 cubic yards

Reduced area in landfill (phases one and two): 18’ wide x 18’ long x 5’ high

Volume of materials diverted from the landfill (phase three): 158.15 cubic yards

Reduced area in landfill (phase three): 20’ wide x 20’ long x 11’ high

Embodied carbon averted through reuse/recycling: tbd

Energy saved: tbd

Jobs created: 556 labor hours