Denver Project

Denver, CO

  • Project #: 7-2025 | Commercial

  • Assignment: Redirect material from the landfill due to overstock

  • Description: N/A

  • Duration: 1 months

  • Project Contact: Bob Tobiason

    • 408-605-7179

    • bobt@circbuild.com

  • Comments: N/A


Project Metrics:

Materials categories diverted:

  • Poly iso insulation sheets

Analytics:

Volume of materials diverted: 70.32 cubic yards

Reduced area in landfill: 21.80’ wide x 21.80’ long x 4’ high

Embodied carbon averted through reuse: tbd

Jobs created: 12.5 labor hours

Interesting fact: The cost to deposit the material in the landfill would have been $1,233. Instead the owner received a federal tax deduction of $4,153 as the material was donated to a nonprofit. The tax deduction was based on the market value of the materials and the client’s applicable tax rate.